View to East1287 viewsThe exterior is complete, doors are in, in this view looking East
|
|
Pier Close Up1258 viewsThis close-up of the pier shows the foam flooring and the power / cable access at the foot of the pier.
|
|
Pier Footings Upgraded1174 viewsAdditional concrete was added to reinforce the pier footings. There will be some space between them and the joists once the sonotube is removed.
|
|
Roof Arch Detail1155 viewsThe detail of the two arched roof can be clearly seen in this shot that looks west from inside the observatory. Wheels will be attached to the larger arched roof after framing is complete. The wall in the foreground will be built up to be just under the arch of the roof.
|
|
Weather Strip -- East1139 viewsThe weather brush on the east side which needs to pass over the wall when the roof opens.
|
|
Panorama to East1023 viewsA panoramic view showing the nice lack of pump equipment in the foreground.
|
|
Completed Footings994 viewsThe footings for the building and the slab for the equipment room are set. This view is looking southwest.
|
|
Security Rail973 viewsThis rail runs the length of the roll-off beam on both side and the angle by the wheel will hold the roof in place in a high wind.
|
|
Southeast Corner967 viewsPaint is mostly complete and the bottom trim on the wall is partially complete.
|
|
Weather Strip -- North961 viewsThe weather strip (or brush) on the long side of the roof.
|
|
Stucco Complete View to East935 viewsThis view to the east shows the contrast of color between the walls and the roof.
|
|
View to Warm Room922 viewsA composite view (note the stitching errors) looking from the observatory into the warm room.
|
|
|