Construction |
 |
| TITLE |
+ |
- |
| FILE NAME |
+ |
- |
| DATE |
+ |
- |
| POSITION |
+ |
- |
|
|

Fully Operational!33 viewsThis is a view of the fully operational observatory.
|
|

Convection134 viewsA major monsoonal convection storm dwarfs the observatory.
|
|

Roof Opener Motor131 viewsThe roof opener motor attached to the side of the observatory.
|
|

Roof Opener Track134 viewsThe roof opener mechanism, with track and opener visible
|
|

Scope in Place204 viewsThe scope, in parked position and imaging equipment installed.
|
|

Warm Room Desk and Scope154 viewsThe new built-in desk in the warm room with the scope visible in the observatory.
|
|

View to South183 viewsCall this a "construction final" exterior view of the observatory, looking to the south. Note the neat area around the well, a real improvement from the mess that was there before.
|
|

View to East142 viewsThe exterior is complete, doors are in, in this view looking East
|
|

Pier Close Up138 viewsThis close-up of the pier shows the foam flooring and the power / cable access at the foot of the pier.
|
|

Pier in Place143 viewsThe pier is in place with the mount adapter successfully attached.
|
|

Weather Strip -- East126 viewsThe weather brush on the east side which needs to pass over the wall when the roof opens.
|
|

Weather Strip -- North123 viewsThe weather strip (or brush) on the long side of the roof.
|
|
|
|