Most viewed - Construction |

Roof Cover on - Wide View to South654 viewsLooking to the south, across the driveway from the water tanks to the observatory.
|
|

Finished Trenching East View649 viewsCompleted trenching, looking to the East. The hole on the left is for the pillar that will support roll-off end of the roof.
|
|

Groundbreaking!634 viewsThe ground is broken on the new observatory and pump equipment building.
|
|

Observatory Framed - Close View628 viewsThis view looks into the observatory from the warm room. There are two two-inch conduits coming from the piers to the control room. The door is on the right, with a window for viewing the equipment.
|
|

Observatory Framed - View to West624 viewsLooking at the east side of the observatory.
|
|

Graded and Trenched Site611 viewsA panoramic view of the graded and trenched site after the first day of work. The soil is solid denatured granite, very solid.
|
|

Roof Sheathed Panorama607 viewsThis panoramic shot looks to the east.
|
|

Observatory Framed - Looking up the hill606 viewsThe steps going up from the drive to the observatory.
|
|

Finished Trenching West View580 viewsCompleted trenching, looking to the west.
|
|
|
|
|
|