Completed Footings997 viewsThe footings for the building and the slab for the equipment room are set. This view is looking southwest.
|
|
Pier Footings Set819 viewsThe cement work on the pier footing is complete. The piers are slightly offset from the walls and significantly offset from a north-south perspective.
|
|
Pier Inspection894 viewsMy daughter inspects the completed pier footing
|
|
Steel Set879 viewsThe steel is set in the ground ready for the concrete to be poured.
|
|
Setting Pier Blocks1376 viewsBlocks are set around the perimeter of the pier footing. Another layer of blocks will go on this layer, then the center will be filled with concrete and two sonotubes of concrete will bring the pier base up to floor level.
|
|
Concrete Pouring845 viewsConcrete is poured into the pier footing. The total load for the day was 5 1/2 cubic yards of concrete, weighing about 21,500 lbs.
|
|
Blocks Set Panorama682 viewsA two-shot panorama of the construction site after the first day of work on the foundation
|
|
Foundation Panorama720 viewsA two shot panorama capturing the first layer of the foundation
|
|
Set Blocks East View713 viewsBlocks set, cement curing, view to the east.
|
|
Cement into the Pump717 viewsCement goes into the cement pump
|
|
Steel for Pier Footing872 viewsThe first layer of steel reinforcement for the pier footing
|
|
Set Blocks West View739 viewsThe first pour and foundation, looking to the northwest
|
|
|