|
Security Rail980 viewsThis rail runs the length of the roll-off beam on both side and the angle by the wheel will hold the roof in place in a high wind.
|
|
Roof Cover on - View to East700 viewsThe roof underlayment is on in this view looking east.
|
|
Windows In View to South696 viewsWindows in, awaiting roof covering, looking to the south
|
|
Step up into Observatory722 viewsThe step into the observatory is in place.
|
|
Windows In View to East684 viewsNewly installed windows and doors in this view to the east.
|
|
View into Observatory754 viewsThis panoramic view (excuse the stitching artifacts) shows the view into the observatory from the warm room. You can also see the top curve of the east wall where it meets the roof.
|
|
View into Warm Room874 viewsThis panoramic view (please forgive the blending artifacts) shows the window and door between the observatory and warm room.
|
|
Roof Sheathed View to East710 viewsThis view to the east shows the roof line quite well.
|
|
Roof Sheathed View to Northwest667 viewsThis view to the northwest shows the east wall built up to conform to the curve of the roof.
|
|
Roof Sheathed View to South705 viewsThe front of the observatory, looking south.
|
|
Utilities Trench719 viewsThis trench will take power and network (and perhaps other) connectivity from the house to the observatory.
|
|
View from Lakeshore Boulevard718 viewsThe sheathed roof shown looking east from Lakeshore Blvd.
|
|
|