Observatorio de la Ballona
Urban & Rural Amateur Astrophotography
Home
Login
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Home
>
Observatory
>
Construction
FILE 105/105
Rough Trenching Complete
A day's work is done. The site is graded and the footings are dug. The large hole in the middle foreground is for the pier base, to be 16" deep and 7' by 4'
Rate this file
(No vote yet)
Javascript must be enabled in order to vote
File information
Filename:
Rough-Trenching-Complete-081229.jpg
Album name:
AndySchlei
/
Construction
Date:
December 29, 2008
Location:
Lake Riverside, California
Filesize:
659 KiB
Date added:
Dec 29, 2008
Dimensions:
1373 x 802 pixels
Displayed:
1355 times
URL:
https://obsballona.net/coppermine/displayimage.php?pid=83
Favorites:
Add to Favorites
Monitor Calibration:
All Content Copyright 2002-2022 by Andy Schlei, All Rights Reserved