Most viewed - Observatory |
Rail Gap672 viewsThis gap in the security rail will allow movement should the wheel need service and also prevents water build up along the security rail.
|
|
Windows In View to East671 viewsNewly installed windows and doors in this view to the east.
|
|
Observatory Framed - View to East667 viewsView looking east. The equipment room and warm room are in the foreground.
|
|
Roof Complete View East666 viewsA panoramic view to the east with the roof complete.
|
|
Roof Cover on - View to South665 viewsSecure (mostly) from the weather, this view looks to the south
|
|
Observatory Framed - Drain Detail661 viewsFine detail on the stairs down to the house.
|
|
Observatory Framed - View to Southwest661 viewsThis wide view shows the walkway from the parking area to the observatory and down the steps to the house.
|
|
Final Trenching Panorama660 viewsA panoramic view of the construction site, ready for foundation steel to be placed.
|
|
Site Before Construction659 viewsA panoramic view of the construction site on the day before construction began.
|
|
Observatory Framed - Pier Footings658 viewsThe two pier footings are neatly in the floor. The holes around the pier footings will be enlarged to prevent any touching between the floor and the pier. The two-inch conduit is for data and goes to the warm room, and there is power at the base of each pier.
|
|
Roof Sheathed View to Northwest658 viewsThis view to the northwest shows the east wall built up to conform to the curve of the roof.
|
|
Observatory Framed - View to South654 viewsThe setting Sun illuminates the observatory in this view to the south.
|
|